Saturday 27 January 2018

Lineside Repairs

It was recently noticed that the gate on our pedestrian level crossing was broken, today some of the lads ran a small engineers train to Percy Main to tend to the gate, photos below

John busy making a new bracket for the pedestrian crossing gate

Engineers train, D2078 w/Dogfish & Toolvan, down the line

The bracket shown below was fitted to prevent the gate from swinging the wrong way and opening towards the running line



Joe giving the gate a fresh coat of paint

No comments:

Post a Comment