Numerous fittings from A.No.5 having been cleaned up and prepared for inspection |
George and George continue to clean A5s components |
2 Safety Valves and one Gauge Frame are just two components of all the fittings that have to be cleaned and inspected during the locomotives annual examination |
No comments:
Post a Comment