Friday, 10 February 2017

Boiler Washout

Michael washing out A.No.5

Built up boiler scale and gunge is flushed to the foundation ring and raked out

A5s firebars neatly arranged after being removed from the firebox 

LHS clack valve removed for cleaning and inspection

Michael removing the RHS clack valve

No comments:

Post a Comment