Michael washing out A.No.5 |
Built up boiler scale and gunge is flushed to the foundation ring and raked out |
A5s firebars neatly arranged after being removed from the firebox |
LHS clack valve removed for cleaning and inspection |
Michael removing the RHS clack valve |
No comments:
Post a Comment