Saturday, 27 February 2016

Saturday Jobs

Robin's ERF lorry in the machine shop for renovation 
Steve and Richard installing Ashington No.5's fire bars
Freight/P-Way train assembled in the yard

08915 running into the loop at Percy Main with the Salmon and Dogfish wagons

The brake van being gravitated through Percy Main platform
The P-Way train re-assembled at Percy Main
The train stopped alongside the Nitelites warehouse
Collecting pallets from our lineside neighbours Nitelites

No comments:

Post a Comment