Tuesday, 7 February 2017

Bit By Bit

Further work on sanding down 401s reverser rod was carried out today



401s original number revealed, stamped into the metal work at the rear of the rod

Monday, 6 February 2017

Engine Removal

The engine being hoisted out of the dumper truck



Further dismantling included the removal of the rear wheels and sections of the frames

The rather old oil that came out of the engine

Saturday, 4 February 2017

401 Update

Springs & Keeps laid out after being removed from 401

The wheelsets have dropped slightly, shown by the unpainted part of the axlebox hornguide being revealed

Wednesday, 1 February 2017

Work in the Steam Department

Numerous fittings from A.No.5 having been cleaned up and prepared for inspection

George and George continue to clean A5s components 

2 Safety Valves and one Gauge Frame are just two components of all the fittings that have to be cleaned and inspected during the locomotives annual examination

Continued Work on 401s Reverser

One side nearly complete


One side completely sanded down


Lick of Paint for the Forklift


Peter continuing his work on the rear of the new forklift truck



Jacking & Packing

Today fitters have begun to jack and pack 401s chassis in preparation for dropping the wheelsets