Saturday, 7 June 2025

Killingworth Road Bridge Construction

Down in the Woodland Walk, James and Michael have been lifting sections of the Killingworth Road Metro Bridge, progressing toward the completion of another section of the trail.


Using a telehandler, Michael carefully positions the first section of the bridge side onto the concrete blocks.


Once both sides of the bridge are securely installed, they will form part of the walking route through the Woodland Walk.


A Google Maps image showing the sections of the bridge prior to dismantling for upgrade works to the Metro system.

No comments:

Post a Comment