Morning preparation on 401: Jack polishing cab fittings, Aadil cleaning the tank and Cameron oiling up.
Kevin following instructions from Trainee Guard Chad whilst buffering up to the carriages.
401 pauses for a photo opportunity with 'Loki' on the miniature before heading to the platform.
Today's guard, Tristan, and station staff, Kai, ready to greet passengers.
401 and train in Middle Engine Lane platform.
The first train of the day at Percy Main.
Kai manning the Guard's Van Shop.
Ready for departure on the second train.
03078, 08915, 'Pony' and 401 lined up at lunchtime.
Clearing the apron has allowed us to trial a new location for the picnic benches.
Cameron driving the third train of the day.
Jack keeps a lookout on the approach to Wallsend Road bridges.
Running round at Middle Engine Lane.
'Loki' arrives into 'Engine House Halt'.
More test trains today on the miniature - it will be open to passengers from Good Friday!
Diesel crew Kevin and Dan carrying out the end of day shunt.
Jack cleaning out the smokebox whilst Aadil washes down the tank.
Cameron dampening down ash in the ashpan.
No comments:
Post a Comment