More space was required for a headshunt to allow a run-round loop to be constructed at the southern terminus of the miniature railway, so volunteers have constructed a small embankment to facilitate this.
With a layer of ash (courtesy of Bagnall 401) applied and tamped down, the track panels are put in place ready for an inspection.
No comments:
Post a Comment