Wednesday, 15 January 2020

Work on 03079

The final piece of metal to be cut out of 03079 halfway there, with the vertical cut done in this photo. This piece is up top on the fuel tank on the RHS

Successfully cut out, cleaned up and after putting a slight curve in at the top the new piece was welded in, now awaiting grinding back and any touch-ups if required before applying body filler

One of the cab doors required quite a bit of attention at the bottom due to rotten bodywork it was taken back slightly, mesh put in underneath and filled with fibreglass body filler 

Wood screwed in at the bottom and the rest of the door given a coat of primer

No comments:

Post a Comment