![]() |
401 out on boiler washout today |
![]() |
Also taking the opportunity to remove the boiler barrels bottom belly plate to replace a suspected broken gasket |
![]() |
After finishing washing through from the front, Steve begins chasing scale and sludge round the foundation ring |
![]() |
Having a look in... |
![]() |
...the view looking in through the bottom of the barrel toward the firebox... |
![]() |
...and toward the smokebox |
![]() |
Washing the bottom of the barrel towards the firebox and down into the foundation ring |
![]() |
David begins making a new gasket for the belly plate |
![]() |
Steve cleans up the flange and studs |
![]() |
David re-fitting mud-hole doors |
![]() |
Hose in after re-fitting washout plugs, mud-hole doors and the belly plate/manhole |
![]() |
Warming fire lit after filling the boiler and re-fitting the last plug |
No comments:
Post a Comment