Wednesday, 5 December 2018

401 Work

Some photos from the weekend's work and today

The top pipe in this photo which is fitted to the water pipe shut off is for the tank gauge soon to be fitted in the cab, the middle pipe is for the steam sands and the bottom pipe is for the blower

The pipes coming into the cab, the yellow lever on the left is the sanding gear

Slacker pipe fitted
Not much progress to show from today, one of the small jobs carried out by volunteers was fitting the drivers front facing spectacle

Over in the Carriage & Wagon workshop, Davy and Steve looked out the rest of the flooring for 401s cab, some of which is in the trolley in view and some pilled up on the right

No comments:

Post a Comment