Monday 17 September 2018

401 Overhaul Progress

401s overhaul is progressing well, photos with captions below. The next 'big job' is the tank lift which is booked in for next month.

LHS cabside on with firemans seat and sanding gear

RHS cabside, drivers seat, brake pipes, reverser and drain cocks handle fitted

Reverser rod fitted

Another shot of the reverser rod showing it connected to the wayshaft and RHS balancer

Side shot showing the fitted cabside and all of the boiler cladding now fitted

No comments:

Post a Comment