| Shunting the shed the get 401s rolling chassis out |
| George, Stuart and Alan start preparing the ashpan for fitting |
| Frames ready to receive the boiler |
| Crane getting in position |
| Straps going on |
| Lift off! |
| Ashpan on |
| Boiler being lowered into the frames |
| Job done, next tasks involve lagging & cladding the boiler before the tank can be fitted along with the cab |
No comments:
Post a Comment