Friday, 13 July 2018

401 Boiler Lift

Shunting the shed the get 401s rolling chassis out

George, Stuart and Alan start preparing the ashpan for fitting

Frames ready to receive the boiler

Crane getting in position

Straps going on

Lift off!

Ashpan on

Boiler being lowered into the frames

Job done, next tasks involve lagging & cladding the boiler before the tank can be fitted along with the cab

No comments:

Post a Comment