Shunting the shed the get 401s rolling chassis out |
George, Stuart and Alan start preparing the ashpan for fitting |
Frames ready to receive the boiler |
Crane getting in position |
Straps going on |
Lift off! |
Ashpan on |
Boiler being lowered into the frames |
Job done, next tasks involve lagging & cladding the boiler before the tank can be fitted along with the cab |
No comments:
Post a Comment