Thursday, 19 April 2018

Further work on ACC5

After its boiler washout Ashington No.5 was put back in shed so Michael W and Steve could set about removing the locomotives safety valves, Michael seen here removing the dome cover

Loosening off the LHS safety valve

Michael heating up the RHS steam injector valve to loosen it so it can be separated from the main manifold

No comments:

Post a Comment