Facebook
Instagram
Twitter
YouTube
Flickr
Stephenson Steam Railway
Wikipedia
Volunteering
Thursday, 15 March 2018
A.No.5 Update
A.No.5 is currently in the main workshop after a boiler washout, the locomotive has now been stripped and is ready for its annual boiler examination
A5s manifold in bits for a thorough inspection and clean
George cleaning the whistle valve
Stripped backhead
The locos gauge glasses after cleaning, ready for inspection
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment