Below is a selection of photos from yesterdays freight & passenger trains and shunting moves with an absolutely great turn out!
Ashington No.5 coming up the bank with the first freight train |
Two photos above of A5 shunting the freight train back into the yard |
Ashington No.5 then ran onto the South end of the passenger train, which was stabled in the run-round loop, here the driver & guard are discussing the shunt required to pick up the third carriage |
Two photos above show ACC5 propelling the train through the platform after A5 had stabled the third carriage in the North headshunt |
Pulling back into the platform with the passenger train, with a large queue of passengers waiting for the 1130 departure |
ACC5 after arrival back with the passenger train, with A5 on the other side of the yard after re-marshalling the freight train |
Ready to detach and run-round |
Visitors admiring A5 in the yard |
ACC5 pulling forward into the headshunt to run-round the passenger train |
A5 pulling the freight train down in the South headshunt |
Then propelling it into the North headshunt ready for ACC5 to pick up |
Trundling back into the yard |
A5 stabled on the crossover with ACC5 at the end of the platform, about to move forward onto the freight train |
Stopped for a quick break and catch up between crews |
Off to the coal road to fuel up |
Bombing up the line with the second freight train |
ACC5 departing Middle Engine Lane with the last passenger train of the day |
Arriving back into Middle Engine Lane, finishing off a very good day! |
No comments:
Post a Comment