Friday, 16 February 2018

Yesterdays Freight Demonstration Day

Below is a selection of photos from yesterdays freight & passenger trains and shunting moves with an absolutely great turn out!

Ashington No.5 coming up the bank with the first freight train


Two photos above of A5 shunting the freight train back into the yard

Ashington No.5 then ran onto the South end of the passenger train, which was stabled in the run-round loop, here the driver & guard are discussing the shunt required to pick up the third carriage


Two photos above show ACC5 propelling the train through the platform after A5 had stabled the third carriage in the North headshunt

Pulling back into the platform with the passenger train, with a large queue of passengers waiting for the 1130 departure

ACC5 after arrival back with the passenger train, with A5 on the other side of the yard after re-marshalling the freight train

Ready to detach and run-round

Visitors admiring A5 in the yard

ACC5 pulling forward into the headshunt to run-round the passenger train

A5 pulling the freight train down in the South headshunt

Then propelling it into the North headshunt ready for ACC5 to pick up

Trundling back into the yard

A5 stabled on the crossover with ACC5 at the end of the platform, about to move forward onto the freight train


Stopped for a quick break and catch up between crews


Off to the coal road to fuel up

Bombing up the line with the second freight train

ACC5 departing Middle Engine Lane with the last passenger train of the day

Arriving back into Middle Engine Lane, finishing off a very good day!

No comments:

Post a Comment