| Richard helps Michael remove the whistle and safety valves |
| Steve dismantling the LHS gauge frame |
| Richard covers up the steam gauge for storage |
| Backhead completely stripped |
| Michael D taking firebars out |
| Michael W was in the firebox passing the firebars to Richard on the footplate who passed them to Michael D on the ground |
| Stacking up firebars |
| Michael climbing out the firebox |
| Cleaning up removed wash out plugs |
| Removing foundation ring mud hole doors for washout |
| Rear centre foundation ring mud hole door being removed |
| Michael inbetween the frames and eccentrics removing, the rather tricky, front corner mud hole doors |
| Slime and scale built up in the boiler over time was washed down to the foundation ring, allowing the team up top to rake it out |
| Richard installing a new vacuum pipe to the rear of the locomotive |
No comments:
Post a Comment