| John & George fitting a gate to the brake van to allow passengers to safely ride on it during Easter Weekend |
| Ashington No.5's boiler being filled up |
| Michael driving the 03 during a small shunt |
| Carriages being taken into the platform, from the cab of D2078 |
| The tool van being painted by Peter with primer after being thoroughly sanded down |
No comments:
Post a Comment