Sunday, 9 March 2025

Planting of the NTSRA Christmas tree

Aaran and Robert have spent the morning relocating the Christmas tree of the NTSRA to the entrance of the site.

Having previously being located in the picnic area, the tree is required to be moved due to the construction of the Miniature Railway.

Having dug a hole and removed the tree from its pot, it is now in the ground at its new location.

With shovels already in hand, they reduced the pile of donated wood chippings by scattering them in the garden area to aid in the growth of plants and seasonal foliage.

Saturday, 8 March 2025

Repair work to Sentinel 9559's regulator valve housing

Steve has began the task of repairing the housing which accommodates the regulator valve for Sentinel 9559.

with the casting being cracked prior to removal and dismantling, above, Steve is seen filing back the cast iron to create a surface to rebuild with weld.

He plans on forming a welded surface to then drill a new hole into the casting across where the crack formed so that the housing can be reassembled to form the regulator body.

Friday, 7 March 2025

401 Washout


Steve in the smokebox pressure washing scale and sediment towards the foundation ring...


...where it is removed.

Lambton Van Painting


Work on the Lambton van, No.21, has continued this week with Cameron busy applying more of the Lambton red top coat.

NCB No.69 features in Steam Railway Magazine

 One of the volunteers, and member of The North Tyneside Steam Railway Association, discovered NCB No.69 featuring on the back cover of Issue 115 of Steam Railway Magazine from November 1989!

The front cover features 'Jubilee' 4-6-0 No.45596 Bahamas.

The inside cover reveals more details about the picture on the back cover: 'The incongruity of a modern road system and a steam worked industrial line seems somehow strange viewed from a 1989 standpoint. Hunslet 0-6-0ST No.3785 of 1953 crosses the A19 with a coal train on the South Hetton Colliery system in Durham on July 17, 1972. credit - Andrew Smith'.

Thursday, 6 March 2025

Lodge Painting


Today, James, Michael, Michael and Tom have been painting the education lodge down the Woodland Walk.

Container Removal


The recently emptied container has been removed to make way for the next phase of miniature railway work...



Within the coming weeks this area will be cleared to make way for the trackbed.



Work can now start on linking the two sides together.


Some track panels were laid out to get a good idea of where things will be and we are not far off!