Work has continued today on Tank 9836, with the west side pads, axle box bottoms and under keeps all being refitted. The east side boxes have been split and the journals and pads found to be in good condition. They will be reassembled soon to give us another running vehicle!
Wednesday, 10 May 2023
Sunday, 7 May 2023
Sunday Steam and Brake Van Rides

1208 'Illingworth' has been hauling trains again today, seen here running round at Percy Main.
The NTSRA's 20t brake van was added to the carriages, allowing passengers the opportunity to experience the railway from a different perspective.
Driver Richard keeping an eye on the road ahead, as viewed through the brake van ducket.
1208 running round at Middle Engine Lane using the newly extended loop.
The last train of the day ready to depart Percy Main.
Keep an eye on the NTSR's Facebook page (see top of blog) to hear about future opportunities to ride in the brake van.
Saturday, 29 April 2023
Relocation of No.3 Points
There are exciting developments being made to Middle Engine Lane yard. The first stage of which involves the relocation of No.3 points.
No.3 points have long been a source of frustration. Whilst the platform at Middle Engine Lane is long enough to accommodate a three coach train, the current position of No.3 points means that the southern-most carriage is fouling the points. Thus, when running into the station with a three coach train it is necessary for the crew to a) stop, de-train, pull forward a coach length, run round, and then pull the train back into the platform, or b) lock out the front 3/4 of the northern-most carriage. With the vision that both of these awkward procedures could be avoided if the run round loop was long enough for locomotives to run round whilst all three coaches were stabled in the platform properly, it was decided to relocate No.3 points to a position further south.
The original position of No.3 points, immediately south of the platform.
Richard clearing ballast with the digger.
The new site of No.3 points being cleared.
Disassembly of the turnout.
Contractors from Bycroft Consulting carrying out the initial work.
Michael and Nev moving rail with the Ironmen,
The new alignment of the mainline.
Max shovelling ballast.
Members of the youth group packing out the newly extended loop.
08915 testing out the new alignment under the watchful eye of railway manager, David.
No.3 points in their new location the following week with fireman Adam preparing to bar the points over so that Illingworth can rejoin its train.
Thursday, 13 April 2023
This Week's Work on 69
Aaran shot blasting the injector water feed handles.
Example result of his labour.
Backhead cladding before paint stripping.
Mysterious number identified (potentially original paint?).
Cladding panel finally stripped to bare metal.
The sand trap cover and an injector body have also been shot blasted...
Tuesday, 4 April 2023
Tank 9836 Progress
Work has continued on tank 9836. All four axle boxes have been dropped and bearings, journals and oil pads have been inspected.
New bolts have been made before the boxes were re-assembled.
The tank is now nearing running condition; cosmetic work will come later on.
Tuesday, 28 March 2023
Work on 69 This Week...
69's driving wheels have been moved inside...
Severely pitted metal on sand boxes removed and new plate welded in...
Thursday, 16 March 2023
More Painting on 69
Rear buffer beam primed.
Recently primed buffer housing fitted to rear buffer beam.
Buffer housing bolts primed.
Back of one of the sets of steps grey primed.
Buffer primed.
Subscribe to:
Posts (Atom)









