The apron after being pressure washed by Michael in readiness for it to be opened to the public on Sundays End of the Season Special |
Wednesday, 31 October 2018
Apron clean
401 Progress
Some photos from the weekend and some from today of the on-going work on rebuilding No.401
Alan on the ladders and Bob in the cab tightening nuts & bolts that connect the top half of the cab with the bottom half |
Same on the drivers side |
George up top and John on the ground, making some adjustments to the chimney |
Steam brake assembly fitted |
Various pipes fitted to the manifold, top pipe is the steam brake to the manifold and the pipe in the centre of the photo is to the whistle |
Blow down valve handle fitted |
Sunday, 28 October 2018
Firemans View
Saturday, 27 October 2018
The End of Season Special!
Join us on Sunday 4th November when we'll be ending our 2018 running season with a bang!
We'll be operating an intensive passenger & freight train timetable throughout the day with Ashington No.5, 08915 and D2078 all in service!
Bagnall No.401 will be out on display, alongside A.No.5 & Consett No.10 allowing visitors to get an up-close look at the progress with the locomotives overhaul.
As well, from 11:45am - 2:45pm the Aycliffe & District Bus Preservation Society will be running FREE heritage bus rides from the museum to Dial Cottage!
Halloween Decor
Photos showing just some of the hand-carved pumpkins that were scattered around the site, decorated museum and the spooky tearoom volunteers!
Ashington No.5 Prep
Photos from this morning of Ashington No.5 being prepared for service, raising steam and being coaled up by hand
Friday, 26 October 2018
Trains this weekend
Flat waggon shunt
08915s brake block fitting
Thursday, 25 October 2018
Yard Shunt
401 Tank & Cab Lift
It's certainly been a busy one today with the last of the 'big lifts' today for Bagnall No.401s overhaul, receiving its water tank, cab and chimney! Photos below
Shunted onto the apron |
Tank lift complete |
Off to pick up the cab roof |
Nuts and bolts for the tank bracket to cab front |
Robin tightening up the other side |
Looking like a steam locomotive once again... |
Richard lifting the chimney onto the pallet truck (out of shot) to transport out |
Picking up the cab roof |
Michael re-connecting the cylinder drain cock linkages |
Roof lift |
Cab roof lift complete |
Chimney going in |
Michael guiding the chimney onto its studs |
Job done! |