| Robin making the new gasket for the dome cover |
| The dome cover being hoisted up above Ashington No.5 |
| Robin & Richard fitting ACC5's dome cover |
| No.08915 & No.10 on charge |
| Steve removing A5's firebars |
| A5 having her firebox vacuumed |
| Michael wire brushing the foundation ring rivet heads in A5's firebox |
| Michael lighting and setting the oxy torch |
| Heating the nuts on the flat wagon axlebox |
| The flat wagons underkeep on the work bench for a thorough clean up |
| Hosing the inside of the underkeep to get rid of any built up scale |
![]() |
| The stores starting to come together |
![]() |
| Michael gives D2078 a run after sitting in the shed for a couple months |
![]() |
| Christmas decorations on the new pallet racking |
![]() |
| Robin stacking the new pallet racking |
![]() |
| Stuart using the new Bridgeport milling machine |
![]() |
| Angus stacking the pallet racket with Ron supervising |
![]() |
| Angus maneuvering the pedestrian truck out of the woodwork shop |
![]() |
| Stefan giving A.No.5's running board a wipe down |
![]() |
| John and Peter bending plate for ACC5's new baffle plate |
| Ron surveying the now completed Brake Van roof |
| Billy dismantling the frame work on the pallet racking |
| Robin & Michael dismantling the pallet racking in the woodwork shop to be reassembled in the machine shop |
| Ashington No.5s backhead having been dismantled in preparation for the locomotives annual examinations |
| A slightly snowy scene at the carriage headshunt |
| Michael & Billy begin to re-assemble the pallet racking in the machine shop |