Robin making the new gasket for the dome cover |
The dome cover being hoisted up above Ashington No.5 |
Robin & Richard fitting ACC5's dome cover |
No.08915 & No.10 on charge |
Steve removing A5's firebars |
A5 having her firebox vacuumed |
Michael wire brushing the foundation ring rivet heads in A5's firebox |
Michael lighting and setting the oxy torch |
Heating the nuts on the flat wagon axlebox |
The flat wagons underkeep on the work bench for a thorough clean up |
Hosing the inside of the underkeep to get rid of any built up scale |
The stores starting to come together |
Michael gives D2078 a run after sitting in the shed for a couple months |
Christmas decorations on the new pallet racking |
Robin stacking the new pallet racking |
Stuart using the new Bridgeport milling machine |
Angus stacking the pallet racket with Ron supervising |
Angus maneuvering the pedestrian truck out of the woodwork shop |
Stefan giving A.No.5's running board a wipe down |
John and Peter bending plate for ACC5's new baffle plate |
Ron surveying the now completed Brake Van roof |
Billy dismantling the frame work on the pallet racking |
Robin & Michael dismantling the pallet racking in the woodwork shop to be reassembled in the machine shop |
Ashington No.5s backhead having been dismantled in preparation for the locomotives annual examinations |
A slightly snowy scene at the carriage headshunt |
Michael & Billy begin to re-assemble the pallet racking in the machine shop |