Thursday 17 January 2019

Work to ACC5s injector

With Ashington No.5 now further into the workshop, more winter maintenance jobs can be carried out

The RHS injector steam feed has been removed after it has been passing for some time now

Investigation into this showed that the guide on the end of the valve was too long and prevented the face from reaching the seat

This was filed to reduce the length, and now has a better fit

No comments:

Post a Comment