Wednesday 2 January 2019

First shunt of the year

The first shunt of 2019 was performed today with 08915 and invovled swapping D2078 and ACC5 around so that ACC5 was in the workshop and winter maintenance can be begin. In this photo, D2078 has been stabled out the way on the loading spur and the road is set for 08915 to propel ACC5 back into the shed

After the Peckett was back in the shed, 08915 comes back and picks up D2078

Stabled in the workshop

No comments:

Post a Comment