Sunday, 14 September 2025

NCB No.69 Brake Rigging

 In the workshop, George has been continuing machining the ends of the brake rigging stringers for NCB No.69. He has tested the fit if one of the six components using dummy plugs to assist with alignment. A 1/8" gap remains, which will be closed during welding, along with the chamfered edge.





No comments:

Post a Comment