Thursday 15 March 2018

A.No.5 Update

A.No.5 is currently in the main workshop after a boiler washout, the locomotive has now been stripped and is ready for its annual boiler examination

A5s manifold in bits for a thorough inspection and clean

George cleaning the whistle valve

Stripped backhead

The locos gauge glasses after cleaning, ready for inspection

No comments:

Post a Comment