Ashington No.5 Update - Knocking Concrete Out

Michael in the smokebox breaking up concrete around the blast pipe base


The concrete needed to be removed to allow access to the nuts holding the base into the plate, the actual base needs to be removed to allow the bottom row of tubes to be punched out

A hammer and chisel was used when getting closer to the nut as to not cause any damage to the nut or the base itself