Michael oiling up D2078's axleboxes 
Ballast ready to be dropped on the reverse curve 
Ballast shoulders built up on the outside of the reverse curve
More ballast being dropped 
Michael and Norman begin profiling the new ballast in the four-foot 
Michael profiling the outside of the reverse curve with a ballast rake
The heat was getting to the two Michaels....

The dogfish being washed out under the water tower 
Aside from P-Way work, Davy continues the cosmetic work on the crane