Thursday 25 August 2016

Arrival of Thomas!

Norman continuing with painting on 08915 
After a good site clear up, the main entrance to the museum is now clearly visible from the car park 
The loading spur cleared ready for the arrival of Thomas The Tank Engine 


Thomas on the low loader arrives at Middle Engine Lane 

Being unloaded 
Sir Topham Hat's stage being assembled
Thomas The Tank Engine stabled in the running shed, ready for the big weekend

No comments:

Post a Comment