Saturday 20 February 2016

Saturday Morning Shunt

Driver Michael at the helm of 08915
Shunter Steve
First part of the shunt was to move the Dogfish & Salmon wagons from the loading spur onto the crossover
08915 coupled up to 401's rolling chassis and the NER Parcel van
View from 08915's cab
The repaired brake van being pulled out of the C&W workshop, through the museum
The brake van being propelled on the loading spur
Uncoupled from the brake van and being moved onto the tool van
One van repaired and the next ready to go in!

The tool van stabled in the C&W Workshop, ready for cosmetic overhaul and minor mechanical repairs
The repaired brake van stabled on the loading spur and 08915 ticking over outside the museum

No comments:

Post a Comment