Some more groundwork has been carried out today on the main station area with the last of the old terram membrane being removed and separation of the old bark covering saved for use down in the Woodland Walk.
Showing posts with label Plant. Show all posts
Showing posts with label Plant. Show all posts
Thursday, 16 January 2025
Miniature Railway groundworks continue
Removal of the last few mounds of bark and top soil.
Marking of the definitive boundary between the Miniature Railway and the picnic area.
A bonus find was several flagstones buried not far below the surface being excavated. These reclaimed flagstones will be incorporated into the new platform at the entrance to the site.
At the end of the day, Tom washes down the bucket of the excavator before parking in storage ready to be used again.
Labels:
Construction,
Miniature Railway,
Plant
Remaining phases of the Miniature Railway begin
Another successful day of preparations and initial groundworks for the remaining phases of the North Tyneside Light Railway.
Two fo the volunteers started to make progress in marking out, excavating and laying the track up to the eventual crossing location.
The laid track being aligned with the previously laid track adjacent to the coal pile to ensure both sides will line up correctly.
Tom operating the excavator to move ash out of the path of the propose railway.
Excavation works then moved onto the picnic area to the entrance to the site. The new main station will sit in this location, the existing ground is being levelled to enable station and railway constreuction.
Labels:
Construction,
Miniature Railway,
Plant
Thursday, 12 January 2023
Friday, 2 December 2022
Line flail
Tuesday, 26 October 2021
Friday, 15 October 2021
Work on the dumper truck
Sunday, 22 August 2021
Sunday, 15 August 2021
Work on the dumper truck
Monday, 21 June 2021
Digging out an old gate post
Sunday, 20 June 2021
Filling the dogfish
Some photos of the Dogfish being loaded up with ballast this afternoon, ready to drop down the mainline for one of the track training schools in order to build up the ballast shoulder on Percy Main curve
Wednesday, 26 May 2021
New water hose
Wednesday, 7 April 2021
New batteries for the forklift
Tuesday, 30 March 2021
New mini-digger
Tuesday, 23 March 2021
New chipper
Saturday, 6 March 2021
Bonfire
Thursday, 4 March 2021
Saturday, 27 February 2021
Lineside work at the Rising Sun bridge
In preparation for the bridge inspection and reopening of the railway, volunteers have made a start clearing lineside vegetation from around the Rising Sun overbridge
![]() |
| Antony clearing vegetation from around the north west parapet |
![]() |
| Tom doing the same on the other side |
![]() |
| Adam working underneath the bridge |
![]() |
| Burning the waste in the back field back up at Middle Engine Lane |
Wednesday, 27 January 2021
Monday, 25 January 2021
Work on the John Deere
Monday, 30 November 2020